Friday 13 April 2012

Solar Maximum Completed

The Texturing is completed. I have found out how the attachment to the shuttle was built when it was recaptured for repairs so I will have to model, UV map and texture this object aswel

The count of remaining textures goes back from 2 to 3 again. At least each one is simpler than the previous one.

The completed Solar Maximum



No comments:

Post a Comment